[vc_row][vc_column][vc_column_text]
Project Details
Location: Clearwater, Florida
Project Period: Completed 2016
Project Description: Inspection of a parallel dock and dock and catwalks; customized plans for the replacement and extension of dock; construction oversight and final acceptance.
The Challenges
While on discovery for this project, where the client wanted to extend the dock would have adverse effects on the marine life below. We were able to develop a design that both satisfied the needs of the client as well and preserve the marine life below.
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][/vc_column][/vc_row]